Global complianceBuilt to local codes across the Americas, Europe, the Middle East, Africa and Asia-PacificLearn more
SINOWISE
Site assessment

SINOWISE launches worldwide compliance coverage, built on the latest NVIDIA AVL

Rack, container and campus projects are specified with components from the list and designed to the grid, certification and installation codes of ten regions worldwide.

SINOWISE has launched worldwide compliance coverage for its projects. Component selection is based on the latest NVIDIA AVL (approved vendor list), all three product lines are covered (liquid-cooled racks, SwiftMDC container data centers and modular data halls), and each project is prepared for the requirements of ten regions: North America, Europe, Japan, South Korea, Southeast Asia, South Asia, the Middle East, Africa, Latin America and Oceania. Other markets are assessed project by project.

What it covers

  • AVL-based selection: key rack, liquid-cooling and power components are selected from the latest NVIDIA AVL.
  • Grid and power distribution: 50 Hz or 60 Hz and the local voltage classes, from 480/277 V in North America and 400/230 V in Europe to the 200 V and 400 V classes in Japan.
  • Certification and testing: NRTL in North America (with UL 2755 as the reference), CE and UKCA in Europe, PSE and VCCI in Japan, KC in South Korea, RCM in Australia and New Zealand, SASO and the Gulf G-Mark in the Middle East, NRCS in South Africa and BIS in India, built on IEC standards and the IECEE CB Scheme to cut repeat testing.
  • Data center and efficiency rules: EU Energy Efficiency Directive reporting, Germany’s Energy Efficiency Act, Singapore’s green data center standard and others, considered at the design stage.
  • Installation codes and documents: drawings, calculations and installation instructions prepared to local electrical, fire and building codes.
  • Transport, seismic and climate: freight, lifting and anchoring plans, seismic design in earthquake-prone regions and extra protection against heat, dust and humidity.

Compliance starts at component selection, not with paperwork at the end. Certification scope and status for each product are confirmed in the project documents.

Where are you deploying?

Request a site assessment →

Product Handbook

Get the product handbook

Specifications, selection guidance and delivery scope for the full Rack, Container and Campus range, in one PDF.

Privacy:how we handle the information you submit

Your Site, Simulated

Run your own site in the twin

We'll build a digital twin from these conditions and walk you through it on a video call. Fill in whatever you know.

Site type

Privacy:how we handle the information you submit

Leads

Leads

Contacts from the four forms on the site. Only you and editors can see them, and each submission is also emailed to [email protected].