Air, cold plate or immersion: choosing a cooling approach by density and site

Rack power decides the approach; whether the site has facility water decides the first step.

Start with power per rack

  • Air cooling: up to 30 kW per rack, matching the AI-Edge tier and suited to edge inference.
  • Cold-plate liquid cooling: up to 100–120 kW per rack (AI-Core, AI-Flex), with integrated CDUs and a 34 / 44 °C secondary loop that allows free cooling with dry coolers.
  • Immersion cooling: standalone tanks of 26–150 kW each with an external CDU; plug-and-play all-in-one tanks of 7–30 kW.

Then check for facility water

With facility cooling water, connect room-level or in-row CDUs. Without it, a liquid-to-air CDU beside the rack (such as MGX SKU 2) lets you start using liquid cooling anyway.

Leave room for later

The MGX 1.1 integrated rack comes in three models. A site without liquid cooling can start with the air-cooled model and later convert the same rack to cold-plate cooling without changing the layout, power or cabling.

How cooling capacity is distributed

Rack-mount CDUs of 15–40 kW serve one or a few racks; in-row CDUs of 120–900 kW serve a row each; room-level CDUs of 300–1,400 kW work with a facility loop.

Not sure which approach fits?

Let the configurator suggest one →

Product Handbook

Get the product handbook

Specifications, selection guidance and delivery scope for the full Rack, Container and Campus range, in one PDF.

Privacy:how we handle the information you submit

Your Site, Simulated

Run your own site in the twin

We'll build a digital twin from these conditions and walk you through it on a video call. Fill in whatever you know.

Site type

Privacy:how we handle the information you submit

Leads

Leads

Contacts from the four forms on the site. Only you and editors can see them, and each submission is also emailed to [email protected].